


Tel: +44 (0)1284 750474
Email: info@multistage.co.uk


Multistage International Ltd © 2009 All Rights Reserved.
Site Designed By: Bubbleworks Group Hosted By: KeConnect Systems Ltd


Lyric Theatre, Belfast, UK
Design, supply, installation and commissioning of stage rigging systems including full counterweight flying and a large orchestra pit elevator
Due for completion in 2010
West Thames College, Isleworth, UK
Design, supply, installation and commissioning of a complete rigging system for a Studio Theatre, complete lighting, audio and communication for a recording studio and TV studio’s.
Completed March 2010
BBC West One, London , UK
Design, supply, installation and commissioning of a complete stage tracking system in three studios, including an electric hoist for track maintenance.
Due for Completion early 2010
Royal Garden Hotel, London, UK
Design, supply, installation and commissioning of all the equipment for stage rigging, stage lighting, audio & communications systems.
Completed 2009
Trinity School, Croydon, UK
Design, supply, installation and commissioning of all the equipment for stage rigging, stage lighting and audio & communications systems.
Completed 2009
Butterworth Hall, Warwick University, UK
Design, supply, installation and commissioning of 4 stage elevators to provide a flexible concert stage platform.
Completed 2009
Mossley Mill Theatre, Belfast, UK
Design, supply, installation and commissioning of stage rigging systems including full counterweight flying and a large orchestra pit elevator
Completed 2009
New Hall School, Chelmsford, UK
Design, supply, installation and commissioning of all the equipment for stage rigging, stage lighting and audio & communications systems.
Completed 2008
Northwood Prep School, Rickmansworth, UK
Design, supply, installation and commissioning of video show relay system and ancillary stage rigging equipment.
Completed 2008
Woodhouse Grove School, Bradford, UK
Design, supply, installation and commissioning of stage rigging lighting and audio systems for new drama studio, and digital audio recording studio.
Completed late 2008
St Georges School, Addlestone, UK
Design, supply, installation and commissioning of all the equipment for stage rigging, stage lighting and audio & communications systems.
Completed 2008
St Mary’s School , Ascot, UK
Design, supply, installation and commissioning of all the equipment for stage rigging, stage lighting and audio & communications systems.
Completed 2008
Aldenham School Theatre, UK
Design, supply, installation and commissioning of all the equipment for stage machinery, stage lighting and audio & communications systems.
Completed September 2007
Pfeiffer Hall, Queens College, London
Design, supply, installation and commissioning of all the equipment for stage rigging, stage lighting and audio & communications systems.
Completed 2007
Epsom College, Concert Hall, UK
Design, supply, installation and commissioning of all the equipment for acoustic canopies, motorised stage rigging, stage lighting and audio & communications systems.
Completed 2007
Epsom College, Performing Arts Centre, UK
Design, supply, installation and commissioning of all the equipment for stage rigging, stage lighting and audio & communications systems.
Completed 2007
Framlingham College, UK
Design, supply, installation and commissioning of all the equipment for stage rigging, stage lighting and audio & communications systems.
Completed 2006
Dame Johane Bradbury School, Saffron Walden , UK
Design, supply, installation and commissioning of all the equipment for stage rigging, stage lighting and audio & communications systems.
Completed 2006
Barbican Theatre, London, UK
Contract for design and installation of 15m & 9m wide electromechanical shutters for the foyer bars.
Completed in 2006
Essex University, Colchester, UK
Design, supply and installation of 5.7m high pivoting projection screen walls.
Completed in 2006
College of Further Education, Guernsey, Channel Islands
Design, supply, installation and commissioning of complete theatre mechanical systems including a motorised 14m span travelling access bridge.
Completed in 2006.
BBC Radio Theatre, London, UK
Design of Spiralift double stage elevator system.
Completed in 2006
Grand Theatre, Leeds, UK
Design of Orchestra Elevator & Rising Barrier systems, including supply of “Spiralift” drive system.
Completed in 2006
Hanham High School, Bristol , UK
Design, supply, installation and commissioning of all the equipment for stage rigging, stage lighting and audio & communications systems.
Completed 2005
Queen Elizabeth Grammar School, Wakefield, UK
Design, supply, installation and commissioning of all the equipment for stage rigging, stage lighting and audio & communications systems.
Completed 2005
Alcester Grammar School, Alcester, UK
Design, supply, installation and commissioning of all the equipment for stage rigging, stage lighting and audio & communications systems.
Completed 2005
City Halls Concert Hall, Glasgow, Scotland, UK
Contract for design, supply, installation and commissioning of theatre mechanical and acoustic systems,
Completed in 2005
Lancing College, Lancing, UK
Contract for refurbishment of existing college theatre and conversion of other space into a studio theatre.
Completed October 2004
Science Centre, Glasgow, UK
Design, supply and installation of “Spiralift” elevator system.
Completed in March 2004
Prior’s Field School, Godalming, UK
Design, supply and installation of complete theatre sound, lighting and mechanical systems.
Completed August 2004
Edgeborough School , Farnham , UK
Design, supply and installation of complete theatre sound, lighting and mechanical systems.
Completed August 2004
Playhouse Theatre, Edinburgh, Scotland, UK
Design of “Serapid” orchestra elevator for Delstar Engineering Ltd.
Completed in 2004
DeHaviland Auditorium, Hatfield, UK
Design of motorised suspension system for acoustic reflectors.
Completed January 2004
The Sage Concert Hall, Gateshead, UK
Contract completed in 2004 for which we have carried out the entire mechanical design and project management for SCX of Sheffield.
Empire Theatre, Hackney, London, UK
Design of motorised winch system.
Completed November 2003
Bishop Perowne High School, Worcester, UK
Design, supply and installation of complete theatre sound, lighting and rigging systems.
Completed August 2003
Coliseum Theatre, London, UK
Design of cable reeling systems and smoke vent release mechanisms.
Completed December 2003
City Hall Theatre, Salisbury, UK
Design, supply and installation of motorised truss system in the auditorium.
Completed 2003
Perth Repertory Theatre, Perth, Scotland, UK
Refurbishment of manual counterweight system.
Completed May 2003
Woodhouse Grove School, Bradford, UK
Design, supply and installation of complete theatre sound, lighting and mechanical systems.
Completed November 2003.
SCX, Sheffield, UK
Design of special winch system for hazardous area operation.
Completed in 2001
City Hall Theatre, Salisbury, UK
Refurbishment of stage suspension systems including design and installation of new motorised stage lighting bar hoist sets.
Completed 2001
UK projects, current and or completed by Multistage International Ltd

Above: Butterworth Hall
Below: Mossley Mill Theatre


Above: Epsom College